Departments:
Highways
Transportation & Traffic
Railroads
Landscape Architecture
Construction
Survey
Simulations (3D)
3

Rishon - Ashdod Railway Tracks

 
Client: Israel Railways Ltd.
Status: Detailed Design and Construction 2003-2008
Estimated cost: 500 million NIS (130 M $)
 
    Video Presentation
Description: Preliminary, Statutory, Final and Detailed Design of an 18 km long double railway tracks from Rishon LeZion to Ashdod. The project includes 5 bridges of 200, 250, 70, 70, and 50 meters long, railway tunnel of 60 m long, and Yavne tunnel of 750 m long.

   
   
 

© 2013 Yenon Research & Design Created by Web3D